Advertisements

Trasee

50 km ULTRA , D+/- 1660 m (start/finish baza Gheorgheni ora start 8.30, timp limita 8h)

Start/finish Baza Sportiva Gheorgheni ora start 08.00, timp limita 8h;

  • km 7,5 PA, PH, PC –  Safety Group check point
  • CHECK POINT ASCUNS (intre km 7,5 si 15,5)
  • km 15,5 PA, PH, PC – Napofarm check point limita ora 11:30 (drop point)
  • CHECK POINT ASCUNS (in jurul km 19)
  • km 24 PA, PH, PC @Televiziune – Rulote4Travel limita ora 12:15 (drop point)
  • CHECK POINT ASCUNS (intre km 24 si 27)
  • km 31 CHECK POINT
  • km 34 PA, PH, PC @Hillhouse – Ronda Check Point limita ora 13:45 (drop point)
  • km 37 PC @Aroma – Aroma Check Point
  • km 42 PA, PH, PC – @Napofarm check point limita ora 15:00 (drop point)
  • km 45 PC @LA VILLA check point limita ora 15:30 (drop point)

PH-punct hidratare (apa, isotonic, cola); PA-punct alimentare (fructe, alimente sarate, glucoza, dulciuri si fructe); PC-punct controlStart Baza Sportiva Gheorgheni traseul incepe in zona Soporului urca in Borhanci, Feleacu (Partia de ski, Televiziune, Hillhouse, Aroma) si retur Borhanci, livada Palocsai, Soporului, Baza Sportiva Gheorgheni. Traseul traverseaza 7 paduri, 3 drumuri locale, pasuni si se desfasoara dupa cum urmeaza: 3km asfalt, 8km drum pietruit, 39km poteci.Descarca traseu GPX Ultramarathon

Total distance: 51.12 km
Max elevation: 750 m
Min elevation: 329 m
Total climbing: 1841 m
Total descent: -1841 m
Download

Sunset CETU

27 km RACE cu D+/- 810 m (start/finish baza Gheorgheni ora start 10.00, timp limita 5h)

  • Start/finish baza Gheorgheni ora start 10.00, timp limita 5h;
  • km 7,5 PA, PH, PC – Safety Group check point
  • CHECK POINT ASCUNS (intre km 7 si 10)
  • km 15,5 PA, PH, PC – Napofarm check point limita ora 13:00 (drop point)
  • km 19 PC
  • km 23 PH, PC (comun cu ULTRA) @ LA VILLA limita ora 14.15 (drop point)

PH-punct hidratare (apa, isotonic, cola); PA-punct alimentare (fructe, alimente sarate, glucoza, dulciuri si fructe); PC-punct control

Start Baza Sportiva Gheorgheni traseul incepe in zona Soporului urca in Borhanci, Padurea Soporului, traversare livada si retur.

Total distance: 27.28 km
Max elevation: 598 m
Min elevation: 325 m
Total climbing: 927 m
Total descent: -926 m
Download

baza-sportiva-gheorghieni-cluj

12 km Cross cu D+/- 300 m (start/finish baza Gheorgheni ora start 10.30, timp limita 2h)

  • Start/finish baza Gheorgheni ora start 10.15, timp limita 2h;
  • km 7,5 PA, PH, PC – Safety Group check point

Start Baza Sportiva Gheorgheni traseul incepe in zona Soporului urca in Borhanci dupa care coboara pe Soporului, urca din nou in padurea care duce spre satul Gheorgheni, revine in zona Sopor (pe langa Muzeul Poarta de su’ Feleac) , Centrul de Cercetari Horticole USAMV, Baza Sportiva Gheorgheni.

Total distance: 13.71 km
Max elevation: 460 m
Min elevation: 329 m
Total climbing: 452 m
Total descent: -452 m
Download

MAI_5006_logo

ITRA member

Traseele evaluate de ITRA (international Trail Running Association) sunt aici:

ULTRAMARATHON 2 ITRA points

HALFMARATHON 1 ITRA point

 

Advertisements
%d bloggers like this: